Second Bedroom Work Continues [Mar. 3rd, 2017|02:15 pm]
Mark Rimmell
I'm looking forward to the day when I can return to this post and think to myself "I'm glad that's all finished". Maybe that day I'll put some before and after pics up in a new post.

wall1wall2
Before and after plastering.

rad_alcove1

New radiator will be installed in this alcove

radPlinthgluing
To make installation easier and neater,
I put together a plinth with a mitered frame for the radiator to stand on.
It also will allow access (either side and in front) to pipe work for maintance.
I am using as much reclaimed timber as possible.

rad_plinthb4rad_plinthaft
The plinth beffore and after sanding.
The whole floor will be stained and varnished later.

skirting
Fixing the skirting on the opposite of the room from the radiator.
I decided to glue this in place because I don't think the brickwork would surive nailing or drilling.
The glue is reversable, and should we need to remove the skirting at a later date it won't damage the wall.

linkReply