Mark Rimmell (markrimmell) wrote,
Mark Rimmell
markrimmell

and today I....

Glazed the bathroom door.

2016-04-22 21.22.55
The colour is more of a dark burgundy rather than the cerise
(at least it looks like cerise on my screen) shown here.
Also the lens has stretched the top two thirds of the door.
Apart from these two inaccuracies, it's not a bad representation.

The door still needs a coat or two of varnish but other than that it's finished. The entire bathroom will be gutted in a few years time once the upstairs bathroom is finished, only the door will remain as is, and probably the radiator. Oh and the cabinets, they'll remain too. But everything else is going to be ripped out. Err... maybe I'll keep the taps.

One of the good things about all this renovating the house thing, we never seem to lack kindling. Which is handy when it comes to drying off wet dogs.

2016-04-22 21.23.56 2016-04-22 21.55.22
A bag of kindling and a drying dog earlier today.
Subscribe

  • Second Bedroom Work Continues

    I'm looking forward to the day when I can return to this post and think to myself "I'm glad that's all finished". Maybe that…

  • Plastered.

    I have difficulty allowing others to work on my house. I find it very stressful getting tradespeople in. The usual conversation when discussing the…

  • Can sleep....

    This has always been a problem for me. Back in 2002 when I started this LJ thing, I was having problems with insomnia. I was just checking some old…

  • Post a new comment

    Error

    default userpic

    Your reply will be screened

    Your IP address will be recorded 

    When you submit the form an invisible reCAPTCHA check will be performed.
    You must follow the Privacy Policy and Google Terms of use.
  • 0 comments