Mark Rimmell (markrimmell) wrote,
Mark Rimmell
markrimmell

Bedroom

bedroom
This pretty much where we're at in this room as I write this.
Sash-window fitted, fireplace that matches the one in the master bedroom restored and fitted, most of the plaster-work patched, all the gypsum plaster skim removed from the external wall (it was neither use or ornament). Since this photo was taken, new coving has also been installed around most of the room. Jo has been filling, and sanding, and filling, and filling....
dado
Sample of dado (aka chair-rail) and the sketch in my notebook.

Just over 32 meters of wood trim, in the shape of dado and picture rail , arrived tihis morning and is currently laying on the lower stairs, well and truly in the way. I hope to get all the trim on the walls over the coming weekend, all except the one wall that still needs plastering.

In other news...

The work on the attic stairs continues. I need to fit a new newel base at the top of the stairs before I can trim out the stair opening and then restore the landing ceiling. I've made a test newel post base and that seems to work ok. So I need to make the real newel base based on that test piece. One more job in a list of scores.
Subscribe

  • Second Bedroom Work Continues

    I'm looking forward to the day when I can return to this post and think to myself "I'm glad that's all finished". Maybe that…

  • Plastered.

    I have difficulty allowing others to work on my house. I find it very stressful getting tradespeople in. The usual conversation when discussing the…

  • Can sleep....

    This has always been a problem for me. Back in 2002 when I started this LJ thing, I was having problems with insomnia. I was just checking some old…

  • Post a new comment

    Error

    default userpic

    Your reply will be screened

    Your IP address will be recorded 

    When you submit the form an invisible reCAPTCHA check will be performed.
    You must follow the Privacy Policy and Google Terms of use.
  • 0 comments